Tahun 2024 akan berakhir, tahun 2025 sudah menanti. Begitu banyak kegiatan yang sudah dilakukan, namun ada beberapa yang harus dibatalkan atau dilanjutkan ke 2025. Tak masalah. Yang penting kita berproses dan bertumbuh untuk lebih maju dari tahun ke tahun.
Jan:
Replace actuator SDV G/L Bravo
STA S/D by LP ESD Station
Troubleshoot control P-1209-A Production
Training BSS Global Safetindo
Troubleshoot S/D C-302C
Feb:
Troubleshoot HMI can't connect to PLC FS
Install additional PC HMI PLC FS
Replace card Coriolis Meter P
Install solenoid valve air dryer P & CP
Prepare Instalasi Hotmama
KIMAP LCV V-100
Pemilu Presiden nyoblos di Marangkayu
Maret:
Workshop CSU STA di LQ
Pilih-pilih material terminasi
Install kabel & hotbolting ELMAG Delta
Support replace battery UPS P 32-ea
Installed Hotmama Hotel 9 Maret 2024
April:
Training CSU K di Rechall
Training BLS di rechall
Membuat Risk Register Instrument ver 1.0
Turbine Meter FS eroded by sand
Lebaran extend 3 hari
Mei:
Communication Hotmama jadi Modbus via intranet
Punch List CSU KRDP
Training fundamental safety di rechall
Latihan pre job safety meeting, HORSE
Function Test ke Sapi
Start migration CSU STA
Training BFF di Santan
Daftar CIP Hotmama
Juni:
Mbah Ari DB
Meeting migrasi CSU STA
Orderan PT dating 10-ea
Pinjam AMS Trex Lawe-lawe utk TA Besar Attaka
TA Besar Attaka: SDV 1406A, Elmag Delta, LCV 1102, PCV-1106, PT PCS P&CP
Replace battery processor PLC Foxtrot
Juli:
Prepare TKI Hotmama
Prepare Risalah Hotmama
Replace support ESD Station Alpha 3-ea
Replace deluge valve hotel with affordable butterfly
Bikin MOC Hotmama
MYPR
Survey replace actuator SDV J by L
Repair & Function test explosive bunker Alpha
Replace actuator SDV G/L Incoming at Hotel
Presentasi dan coaching PDCA 1 Hotmama
August:
S/D berturut-turut di NIB:
- SA G2050 high temp
- STA G2010 kabel exiter
- SA S/D saat replace UPS
- Fox: low pressure air comp
- MLHN: LSHH FLT 100 BOL lama
Upacara dan lomba 17an
Replace LSHH slop tank Bravo
Repair SDV incoming Golf at Fox
Replace air dryer KRDP
Sept:
Ombak tinggi, banyak yang mabok saat on
Replace solenoid valve IAC loading/unloading CP
Repair LT-1105 CP
Repair deluge valve Serang
TA STA CSU Migration tahap 1
SDV Incoming STA at Alpha stucked open
Delta S/D LSHH Gross
S/D 302C loading can't close, 302A tidak bisa OL replace sol valve suction valve
Okt:
Replace level chamber test separator FS
Pertamove start
SWRO Low flow ditemukan bocor dari mesin cuci
Replace GMR G8012-8014 & connect to PI Vision
TA Serang
Prepare presentasi CIP --> wawancara value creation
Training CSU STA/K di Pasir Ridge
Nov:
Install Cover air dryer CP
Replace Filter air dryer P
Meeting drilling J, L, STA 2025
Prepare material masterlist
C40 shutdown berulang kali inboard thrust bearing temp hi, diputuskan OH selama 5 hari
Hotel: S/D by low press air compressor
MLHN: S/D by low press ESD Loop
TA STA CSU Final Migration & Punch List + OH C40 Serang
CBT Risk Management & PEKA Online
CBT Training MAHIR
CBT Hazop
PI Vision PLC Bravo
Desember:
Service 4000h C-303B, PSD H & J
Lifting back G8014
Replace LCV V-100 Serang
Replace Hyd Chamber SDV Gross Header J
SDV Gross Header J tidak bisa buka, night work
Final revision Risk Register HES
No comments:
Post a Comment