Thursday, August 15, 2019

Cort G5F BW NS

Akhirnya memberanikan diri meminang sebuah gitar yang menurut saya high end, suara dan bentuknya membuat telinga dan jari nyaman. 


The new Grand Regal Series from Cort is based on the popular Grand Auditorium body shape that sits right in between the dreadnought and concert-size shapes for a full but balanced sound. The 45mm nut width also makes it ideal for fingerstyle playing. Offered in various models with solid Sitka spruce top with mahogany back and sides, solid European spruce top with Madagascar rosewood back and sides and solid red cedar top with blackwood back and sides, the Grand Regal Series offers variety of choices to suit virtually any musical style and taste.


SPECIFICATIONS

 
CONSTRUCTIONDovetail neck joint
CUTAWAYVenetian Cutaway
BODYGrand Auditorium body
NUT WIDTH45mm (1 3/4")
TOPSolid Cedar Top
BACK & SIDESAustralian Blackwood Back & Sides
NECKMahogany
BINDINGIvory body binding
FRETBOARDRosewood Fingerboard
FRETS20 Frets
SCALE25.3" (643mm)
INLAYAbalone inlay
TUNERSDie-casting Tuners
ROSETTEMultiple rosette
BRIDGERosewood Bridge
PICKUPSSonicore Pickup
ELECTRONICSFishman Presys EQ
STRINGSD'Addario EXP16 Strings
BRACINGAdvanced Scalloped X-Bracing
SPECIALGenuine Bone Nut & Saddle 
Sonically Enhanced UV Finish
ADDITIONALEbony Bridgepin






Thursday, August 01, 2019

MEMBANGUN KOS 2018-2019

REKAPITULASI (TOTAL 520.250.000 jt)
Borongan bangunan 427.350.000
Mulang dasar 1.4jt
Perijinan IMB dll 17.1jt
Listrik 7x  = 12jt
Biaya paving halaman, sanggah 15jt
Biaya sumur bor 8,5jt
Biaya CCTV + memory 1.2jt 
Kanopi 10.500.000
Biaya melaspas 15jt (18 mei 2019)
Konsumsi melaspas + meja kursi 3.5jt + 1jt walesan
Gorden 800rb
Tambahan pekerjaan instalasi power cctv n tanah urug 1.9jt 
Biaya pasang partisi dan 1 meteran 5jt

Rincian biaya: 
Luas bangunan 129.5 m x 3.3jt = 427.350.000
Biaya rumah 427.350.000
Termin 1 bayar 130jt pada 13 agst bank mandiri
Termin 2 130jt
Termin 3 130jt
Termin 4 39.250.000
Tambahan pekerjaan instalasi power cctv n tanah urug 1.9jt 

Biaya PERIJINAN (total 17.100.000)
- adat 3jt
- dines 0
- kades 1.6jt
- camat 100rb
- IMB 11.350.000
- tips 1jt

Biaya Mulang Dasar
- banten 1.2jt
- konsumsi 200rb

Biaya bayar BPHTB (free)
- bphtb 
- tips 

Harga paving 6cm tebal/meter = 14.98jt
- 6.98 jt = 97m2. 
- 72k/meter
- ongkos tukang 8 jt

HISTORY:
July ttd kelian adat, kel dines, kades, camat
29 Juli masukkan IMB
03 Agustus IMB jadi
14 Agst bayar IMB 11.350k
14 agst bayar 1 jt pak santika
10 agst ttd kontrak di rumah hady
12 agst bikin bangbang 1 biji
13 agst mulang dasar, aji ukur sama wayan eka
14 agst ukur ulang, kurangin 5cm dr lebar 9m
15 agst lubang kurang 6 lagi. Agak mepet ke depan. 
18 agst lubang sdh selesai semua. Ktmu pengawas lapangan anggi dan ardi. Tukang ngulat besi. 
7 sept ngecor sloof
17 sept selesai ngecor tiang
25 sept sdh mulai masang tembok batako
27 sept sdh pasang kusen
04 okt mulai rakit kayu utk cor dak lt 2
25 Okt selesai ngecor
30 Okt mulai lepas kayu cor
Pasang sumur bor
30 des mulai ngecat tembok
Serah terima kos
18 Mei 2019 Melaspas

Biaya sumur bor dan PLN toko:
8.566.000 + 1.550.000 = 10.116.000
Biaya listrik 6 x =10.500.000
Total PLN+sumur = 20.616.000

_____________________
9 feb 2019
Beli paving 97 m x  72rb/m = 6.98jt
Tanah 1 truk
Pasir 1 truk
Batako 300
Semen 5 sak
Sanggah 2 x 50rb

Ongkos pasang paving 7jt
Total 15jt plus tips aji

8 Mei pasang kanopi
10.500.000 utk di toko dan depan kos
_______________________

Biaya pasang partisi dan 1 meteran 5jt