On duty 14-27 Sept 2022
14 otw ke attaka via santan dengan mentari. Di samarinda banjir, terminal ada longsor jadi agak macet
15 di LQ aja persiapan TA sama pilih2 WO
16 persiapan TA, screening WO
17 serang TA sampe jam 11.30 pulang. Sampe LQ 00.30 tidur jam 1.30
18 masih ngantuk sehabis TA, survey CP pemasangan tubing 303B
19 ukur tensi pertama 145/82 yg kedua 126/77, standby aja di LQ
20 meeting RCA Melahin, CP cek chemical injection
21 acting SH maint, pindahin actuator sdv 1406 ke CP, koordinasi kabel dr construction, order pressure gauge panel mounted
22 ke FS sdv test cant open
23 CP: air supply 303B, recon suct loading 302C, tubing fuel meter 302C bocor
24 prod support ganti 24 vdc battery, test resimex sampe pressure 800 psig
25 air supply 302C di CP
26 install tubing 1/2 di CP venting SDV GL to OGGL ramah tamah dgn pak iman di rec hall
27 close WO, upload pk cek list, foto2 pak Iman
28 off via smd naik jet air star
Trip:
05.00 - 06.35 atk-stn (Puyuh)
06.45 - 08.15 stn-pranoto (Roman Badak)
09.40 wita - 10.00 wib super airjet apt-sby
10.00 - 12.30 wib waiting at juanda
12.30 wib - 14.30 sub-dps
15.00 - 16.45 ngurah rai - home
No comments:
Post a Comment