Tuesday, April 11, 2023

Power Monitoring, CLSR, Pulang Selasa

29 Mar - 10 Apr 2023

29 otw attaka jam 7.30 mifta agak telat goshow dr sby. Via propane jam 4 sampe attaka. 
30 function test lima
31 install power monitoring air dryer CP ditemukan compressor loading terus
1 cek alpha slug catcher, 301B SD by vibration n cant start due to lube oil pressure
2 panel lamp, cooling fan plc bravo
3 funct test n pm bravo
4 training CBT, akhlak n bbs, serang SD G2050
5 acting SH maint
6 prepare actuator GL bravo
7 clsr cbt
8 resetting set point air dryer CP from 2 to 6C. Kerjain training clsr. Konsultasi MCU, dapat 3 rujukan: LVH, kolesterol naik 220, LDL 155, eLFG turun tapi katanya tidak terlalu signifikan. Konsultasi ahli gizi. 
9 repair pressure controller utk pcv fuel CP, 
10 func tes prod. Ke santan sore nginep. 
11 off selasa maju sehari. Off kali ini hanya 8 hari. Dr santan ke apt nebeng sumarsono brgkt jam 5 subuh. Naik citilink jam 10.30 landing jam 3 sore di Bali. Estafet naik gocar bandara-bali buda-men lari-pandak gede

Mulai benar2 tidak pake masker
Batas kursi di meja security dilepas
EMMA diperingkas
#Resetting air dryer cp set point 6C
#Ke bravo PLC fan, lampu, kabel 220
#Bikin timesheet
#Gas Meter foxtrot suruh restart
#Beli elmag delta
#Tnya erik jdwal kapal

Tripnya Henry Jatmiko off:
7.30-9.00 santan-APT
7.30-9.50 stn-robinson
10.30-13.00 robinson-sepinggan