TURBINE
- PM 8000h C2 STA (Januari)
- TA service Serang C30 C40 (Februari)
- Support soaking C303B to increase performance boost compressor collaboration with TMG (
- service 4000hr and support engine change out 302C
- support purging compressor C-302A when repair venting line due to corroded
- RCA recommendation replace limit switch C-301B from magnetic to mechanical type limit switch
- follow up RCA recommendation C-302C to install clamp at surge control valve
- involved in RCA shutdown C-301A by malfunction some Pressure Transmitters due to water condensation at PT terminal.
- verification plain head CO2 bottles of all turbine compressors as recommended in Solar Bulletin.
PROJECT
- Manage MOC Air Dryer. Coordination with Procurement team for purchasing.
- Maintain MOC V107. Coordination with Engineer to discuss the spec. --》 MOC cancel due to the PCV already come. PCV was replaced by the brand new.
- Replaced Server Computer for PLC Production & CP colaboration with PCN Engineer.
- Replaced SDV of Gas Lift from Foxtrot to Bravo. Coordination with Machine Shop to fabricate support and assembly actuator and valve. Replaced during Attaka remote partial turn around/shutdown.
- Support WTU (water treatment unit) project at Bravo. Reactivation and ensure control system and all safety devices of oily water pump and hydrocycline are in placed and functioning.
- Support WTU project at CP. Troubleshoot and ensure all control system are functioning.
- Coordinate with 3rd party DKM to fabricate Juliet Gross Header SDV due to leaking. Still on fabrication at DKM workshop.
- support reactivation and commisioning Test Separator Hotel Refurbishment. Provide control system (PCV, LCV, meter, etc) and reinstall all safety devices and functioning.
- Attaka Optimization and commisioning project V88 as KOD (Attaka CP lowering pressure). PLC online editing, hardware installation and commissioning, coordination with FE&C.
- Order DVC 6200 for pcv 1106 cp and install liquid trap to improve reliability of fuel system for turbine compressor at Compressor Platform.
- Fabricated spool and replace regulator air supply Lima Platform to improve reliability of instrument air system to prevent unplanned LPO.
- With FMG review gas meter over scale and replacement FE1103 outgoing gas to Santan to improve post Attaka Optimization Project.
- UB-STS reactivation. Prepare safety devices.
- Manage MOC for unused LSHH Gross Separator at Juliet Platform.
- Upgrade PC Attaka telemetri and coriolis meter Production Platform.
- Replace monitor TT4000 VLP-1600 Turbine Compressor FS
- Project well reactivation FS-4 dan FS-8
- Reactivation D6, FS12, FS5
- support well reactivation D3 dan C11
EXTRACURICULER
- Support repair HV cable at Hotel, cable for Juliet and Delta. Coordination with Construction and Kota Minyak.
- Support replacement of Trafo LQ colaboration with Electric team.
- Support project Trafo purification LQ at Production.
- Review PM set up ata Hotel Platform to activate and deactivate some PM schedule.
TROUBLESHOOT
- troubleshoot LT-1501 CP vent scrubber due to malfunction (ditemukan kabel kendor)
- troubleshoot Lima PSHH Gross malfunction
- repair broken cable PT559 A/C karena ditabrak kapal
- troubleshoot VLP PT breakaway dan vibration
- troubleshoot (setting up) positioner Surge control 301A.
- repair SDV 1408 gas buy back from CP to Alpha
- troubleshoot C-301B due to secondary fuel valve suspected leaking
- shutdown by HS-13 due to malfunction
- inspect LCV V88 due to not flowing the stream.
- repair SDV Incoming Oil from Juliet at Hotel
- optimization air dryer deadline agar di drain prior purchasing new air dryer completed.
MATERIAL
- Provide material list well accessesories for milky well reactivation. Coordination with procurement team to order.
- Provide material list for instrumentation 2018 to ensure NO instrument equipment have enough spare part and running smoothly during EOC.
- ESAR some spare part (gas detector, actuator SDV Juliet, trafo LQ at Prod, air dryer, back pack).
- TE air dryer
- TE turbine part
- order level switch K-Tek for Bravo
- order digital positioner DVC 6200 for pcv 1106 fuel control of turbine compressor CP.
- order obsolete fire detector to 3rd party Wifgasindo
No comments:
Post a Comment